After years of contemplating expansion options in Beijing, a unique site in a most fantastic area (by our standards) became available. Construction began in May 2014, with an opening scheduled for early 2015. This is an active construction site at the moment, so pictures and commentary will go up in a fairly delayed fashion..  But please stay tuned, and feel free to email us any questions or comments along the way.

Wooden Railings

Oops – Wood needs some adjustment here


This is why we are doing this


There you see it, wood railings all over

Rest of the Stairs

The Private Stairs

So what’s it like? These pictures should show it off nicely: The added stairs also mean that the terrace can get some immediate use for laundry

The Private Terrace

It’s time to figure out how to build our way up to the private terrace in the North-West room. We’ve decided to do it the simplest way possible. All wood steps fastened on both sides to the two walls. Exciting!


Floating stairs seems scary – but why not?


Look at that! Starting to resemble our 3D mockups now

Electrical time

In order to move the electrical boxes we were required to turn off the power leading into the yard. In order to turn off the power we needed a key to the power box. If you want to get the key, you have to pay the local government roughly 2000RMB for them to open the box, shut the power down and move the electrical boxes. This took 3 people a few hours to do, but while we oversaw the work we got a chance to capture photos of the yard from some unique angles.